Project Name: The Arbour

Unit Type Total Units Allotted Balance
4 BR + Utility 1137 1137 0
Parking Spaces (for right to exclusive use) 3411 3411 0

List Of Statutory Approvals

Sr. No. Approvals/NOC Approval no. Date Downloads
1 HARERA registration RC/REP/HARERA/GGM/671/403/2023/15 23.01.2023 Download PDF
2 Zoning plan approval Drg. NO. DTCP 8895 02.01.2023 Download PDF
3 Building Plan / Site Plan Approval ZP-1524/AD(RA)/2023/2097 20.01.2023 Download PDF
4 Earlier Approved Building Plans BS-1 20.01.2023 Download PDF
BS-2 20.01.2023 Download PDF
BS-3 20.01.2023 Download PDF
BS-3 20.01.2023 Download PDF
BS-4 20.01.2023 Download PDF
BS-5 20.01.2023 Download PDF
BS-6 20.01.2023 Download PDF
BS-7 20.01.2023 Download PDF
BS-8 20.01.2023 Download PDF
BS-9 20.01.2023 Download PDF
CS-1 20.01.2023 Download PDF
E-1 20.01.2023 Download PDF
E-2 20.01.2023 Download PDF
E-3 20.01.2023 Download PDF
E-4 20.01.2023 Download PDF
SD-1 20.01.2023 Download PDF
SD-2 20.01.2023 Download PDF
Site plan ST-3 Calculation 20.01.2023 Download PDF
Site Plan ST-1 20.01.2023 Download PDF
Site Plan ST-2 20.01.2023 Download PDF
Site plan ST-3 Calculation 20.01.2023 Download PDF
ST-4 20.01.2023 Download PDF
TA-1 20.01.2023 Download PDF
TA-3 20.01.2023 Download PDF
TA-4 20.01.2023 Download PDF
TA-5 20.01.2023 Download PDF
TA-6 20.01.2023 Download PDF
TA-7 20.01.2023 Download PDF
TA-8 20.01.2023 Download PDF
TA-9 20.01.2023 Download PDF
TA-10 20.01.2023 Download PDF
TB-1 20.01.2023 Download PDF
TB-2 20.01.2023 Download PDF
TB-3 20.01.2023 Download PDF
TB-4 20.01.2023 Download PDF
TB-5 20.01.2023 Download PDF
TB-6 20.01.2023 Download PDF
TB-7 20.01.2023 Download PDF
TB-8 20.01.2023 Download PDF
TB-9 20.01.2023 Download PDF
TB-10 20.01.2023 Download PDF
TC-1 20.01.2023 Download PDF
TC-2 20.01.2023 Download PDF
TC-3 20.01.2023 Download PDF
TC-4 20.01.2023 Download PDF
TC-5 20.01.2023 Download PDF
TC-6 20.01.2023 Download PDF
TC-7 20.01.2023 Download PDF
TC-8 20.01.2023 Download PDF
TC-9 20.01.2023 Download PDF
TC-10 20.01.2023 Download PDF
TD-1 20.01.2023 Download PDF
TD-2 20.01.2023 Download PDF
TD-3 20.01.2023 Download PDF
TD-4 20.01.2023 Download PDF
TD-5 20.01.2023 Download PDF
TD-6 20.01.2023 Download PDF
TD-7 20.01.2023 Download PDF
TD-8 20.01.2023 Download PDF
TD-9 20.01.2023 Download PDF
TD-10 20.01.2023 Download PDF
TE-1 20.01.2023 Download PDF
TE-2 20.01.2023 Download PDF
TE-3 20.01.2023 Download PDF
TE-4 20.01.2023 Download PDF
TE-5 20.01.2023 Download PDF
TE-6 20.01.2023 Download PDF
TE-7 20.01.2023 Download PDF
TE-8 20.01.2023 Download PDF
TE-9 20.01.2023 Download PDF
TE-10 20.01.2023 Download PDF
Toilet 1 20.01.2023 Download PDF
4 Revised Building Plans (In-principally approved) All Floor Section Elevation Site Toilet & Area Calculation Block-A,B 29.04.2024 Download PDF
Basement - 01 North Pocket Only Services Under Tower-A,B,C 20.04.2024 Download PDF
bs-01 BASEMENT -01 NORTTH POCKET TOWER-A, B, C 29.04.2024 Download PDF
BS-02 29.04.2024 Download PDF
BS-03 29.04.2024 Download PDF
BS-3A 28.03.2024 Download PDF
BS-04 29.04.2024 Download PDF
BS-04A 28.03.2024 Download PDF
BS-05 28.03.2024 Download PDF
BS-06 28.03.2024 Download PDF
BS-07 29.04.2024 Download PDF
BS-08 29.04.2024 Download PDF
BS-09 29.04.2024 Download PDF
BS-10 29.04.2024 Download PDF
BS-11 29.04.2024 Download PDF
BS-12 TOWER-D, E 29.04.2024 Download PDF
ELEVATION-1 TOWER-A 29.04.2024 Download PDF
ELEVATION-1 TOWER-B 29.04.2024 Download PDF
ELEVATION-1 TOWER-C 29.04.2024 Download PDF
ELEVATION-2 TB-07 29.04.2024 Download PDF
ELEVATION-2 TOWER-3 29.04.2024 Download PDF
ELEVATION-2 TOWER-A 29.04.2024 Download PDF
ELEVATION-2 TOWER-C 29.04.2024 Download PDF
ELEVATION-2 TOWER-D 29.04.2024 Download PDF
ELEVATION-3 TOWER-D 29.04.2024 Download PDF
ELEVATION-3 TOWER-E 29.04.2024 Download PDF
ELEVATION-3 TB-08 29.04.2024 Download PDF
ELEVATION-3 TOWER-A 29.04.2024 Download PDF
ELEVATION-3 TOWER-C 29.04.2024 Download PDF
ELEVATION TOWER-E 29.04.2024 Download PDF
ENTRANCE GATE DETAIL NORTH G-01 29.04.2024 Download PDF
FAN ROOM DETAIL FR-01 29.04.2024 Download PDF
FLOOR PLAN SECTION ELEVATIO AREA CALCULATION 29.04.2024 Download PDF
GROUND COVERAGE AREA ALCULATION TOWER-B 29.04.2024 Download PDF
GROUND COVERAGE AREA CALCULATION TOWER-C 29.04.2024 Download PDF
GROUND COVERAGE AREA CALCULATION TOWER-E 29.04.2024 Download PDF
GROUND COVERAGE CALCULATION TOWER-D 29.04.2024 Download PDF
RAMP-01 & 02 DETAIL RM-01 29.04.2024 Download PDF
RM-2 RAMP-DETAIL BASEMENT 29.04.2024 Download PDF
Site Plan 28.03.2024 Download PDF
ST-02 29.04.2024 Download PDF
ST-03 29.04.2024 Download PDF
ST-03A 29.04.2024 Download PDF
STILT FLOOR AREA CALCUATION TOWER-A 28.03.2024 Download PDF
STILT FLOOR PLAN AREA CALCULATION TOWER-B 29.04.2024 Download PDF
STILT FLOOR PLAN TOWER-E 29.04.2024 Download PDF
TA-02 GROUND COVERAGE AREA TOWER-A 29.04.2024 Download PDF
TC-01 STILT FLOOR PLANAREA CALCCULATIONTOWER-C 29.04.2024 Download PDF
TD-01 STILT FLOOR AREA CALCULATION TOWER-D 29.04.2024 Download PDF
TD-6 ELEVATION-1 TOWER-D 29.04.2024 Download PDF
TUNNEL DETAIL SECTION ECO BRIDGE SECTION TN-01 29.04.2024 Download PDF
TYPICAL FLOOR TOILET DETAIL TOWER- A,B,C,D & ews 29.04.2024 Download PDF
Sr. No. Approval/ order Memo No. Date Downloads
1 Licence No. 123 of 2012 Endst.No.LC-1994-JE (S)-2012/26407 20.12.2012 Download PDF
2 AAI NOC for height AAI/RHQ/NR/ATM/NOC/2021/476/1957-1960 21.12.2021 Download PDF
3 Forest NOC R7K-K4G-LG2U 15.03.2022 Download PDF
4 Aravali approval 37/MB 27.04.2022 Download PDF
5 Environment Clearance EC22B039HR137715 24.04.2023 Download PDF
5.1 Environment Clearance (Six-monthly compliance report) EC22B039HR137715 01.12.2023 Download PDF
5.2 Environment Clearance (Six-monthly compliance report) EC23B039HR116175 01.12.2023 Download PDF
5.3 Environment Clearance (Six-monthly compliance report) EC23B039HR116175 04.07.2024 Download PDF
6 Mining Approval 1472 31.08.2022 Download PDF
7 Consent to Establish HSPCB/Consent/329962322/GUNOCTE25616299 18.07.2022 Download PDF

Documents

tr>
Sr. No. Title Documents
1 Application Form Doenload PDF
2 Allotment Letter Doenload PDF
3 Agreement for Sale Doenload PDF
4 Site Plan Doenload PDF
5 Payment Plan Doenload PDF
6 List of RERA registered brokers Doenload PDF
7 Ongoing litigations Doenload PDF
8 Site Photographs 29.03.24 Doenload PDF
30.04.24 Doenload PDF
19.06.24 Doenload PDF
Promoter Details
Name DLF Home Developers Limited
Registered Address 1st Floor, DLF Gateway Tower R Block, DLF City, Phase-III Gurugram, Haryana 122002
Corporate/ Office Address 1st Floor, DLF Gateway Tower R Block, DLF City, Phase-III Gurugram, Haryana 122002
Phone No. Mobile : +91-124-4769000, +91-9711080232
Email ID haryanarera@dlf.in
Other Details
Architect Mr. Prateek Bhatnagar
Contractor M/s. DK Nagpal & Associates
Structural Engineer M/s. Thornton Tomasetti
Chartered Accountant Mr. Harsh Deep Sachdeva
MEP Consultant M/s. Arup Consultants
Proof Consultant M/s. LERA Consulting Structural Engineers
Project developed in last 5 years 1. Gardencity Central,
2. Independent Floors at DLF Alameda Sector-73,
3. Independent Floors at DLF City Phase I & II,
4. Independent Floors at DLF City Phase IV,
5. Independent Floors at DLF Gardencity Sector-91/92,
6. Moulsari Enclave
Facilities to be provided by the promoter on the additional land/ area/space, if any, which is not included in the total cost of the project, which the promoter will retain and operate on the commercial basis N/A
Project Status Construction Started
Website Last Updated on: 20.06.2024